Hemet, CA 92545,235 Hanoverian DR
See all 48 photos
Hemet, CA 92545,235 Hanoverian DR
Hemet, CA 92545,235 Hanoverian DR
Hemet, CA 92545,235 Hanoverian DR
Hemet, CA 92545,235 Hanoverian DR
REQUEST A TOUR If you would like to see this home without being there in person, select the "Virtual Tour" option and your agent will contact you to discuss available opportunities.
In-PersonVirtual Tour
Mon
11
Aug
Tue
12
Aug
Wed
13
Aug
$ 599,900
Est. payment /mo
Active

235 Hanoverian DR Hemet, CA 92545

5 Beds

4 Baths

3,284 SqFt


UPDATED:

Key Details

Property Type Single Family Home

Sub Type Single Family Residence

Listing Status Active

Purchase Type For Sale

Square Footage 3,284 sqft

Price per Sqft $182

MLS Listing ID SW25128921

Bedrooms 5

Full Baths 4

HOA Y/N No

Year Built 2007

Lot Size 7,405 Sqft

Property Sub-Type Single Family Residence

Property Description

5 Full Bedroooms And 4 Full Bathrooms. Beautiful Stacked Stone Elevation. IN GROUND POOL AND SPA w/Stacked Stone Accents. Firepit w/Stacked Stone/Concrete Bench Seat. Cook's Kitchen Includes Granite Countertops, White Cabinetry, Stainless Steel Appliances, Walk In Pantry, Recessed Lighting And Large Center Island Which Opens To Great Room. Great Room Includes Cozy Gas Fireplace. Downstairs Bedroom And Full Bath Adjacent To Full Bedroom. Spacious Downstairs Inside Laundry Room. 29 Solar Panels To Save On Energy Costs. 4 Full Bedrooms Upstairs. Custom Tile In Bathroom Four. Luxury Vinyl Plank Flooring Upstairs In Hallway And Several Bedrooms. NO HOA. Lots Of Room On Both Sides Of Home...This Is Truly A MUST SEE!!!!.

Location

State CA

County Riverside

Area Srcar - Southwest Riverside County

Rooms

Main Level Bedrooms 1

Interior

Interior Features Breakfast Bar, Ceiling Fan(s), Separate/Formal Dining Room, Granite Counters, High Ceilings, Open Floorplan, Pantry, Recessed Lighting, Primary Suite, Walk-In Pantry, Walk-In Closet(s)

Heating Central, Forced Air, Natural Gas, Zoned

Cooling Central Air, Dual, Electric, Zoned

Fireplaces Type Gas, Great Room, Outside

Fireplace Yes

Appliance Dishwasher, Disposal, Gas Oven, Gas Range, Microwave, Water Softener, Water To Refrigerator, Water Heater

Laundry Washer Hookup, Gas Dryer Hookup, Inside, Laundry Room

Exterior

Exterior Feature Fire Pit

Parking Features Concrete, Door-Multi, Direct Access, Driveway, Driveway Up Slope From Street, Garage Faces Front, Garage, On Street

Garage Spaces 2.0

Garage Description 2.0

Pool In Ground, Private

Community Features Curbs, Gutter(s), Sidewalks

Utilities Available Electricity Connected, Natural Gas Connected, Sewer Connected, Water Connected

View Y/N No

View None

Roof Type Concrete,Tile

Accessibility Accessible Doors

Porch Concrete, Front Porch, Open, Patio

Total Parking Spaces 2

Private Pool Yes

Building

Lot Description Back Yard, Front Yard, Sprinklers In Front, Lawn, Landscaped, Rectangular Lot, Sprinkler System, Trees, Yard

Dwelling Type House

Story 2

Entry Level Two

Foundation Slab

Sewer Public Sewer

Water Public

Architectural Style Mediterranean

Level or Stories Two

New Construction No

Schools

School District Hemet Unified

Others

Senior Community No

Tax ID 448492010

Security Features Carbon Monoxide Detector(s),Smoke Detector(s)

Acceptable Financing Cash, Conventional, FHA, Submit, VA Loan

Listing Terms Cash, Conventional, FHA, Submit, VA Loan

Special Listing Condition Standard

Virtual Tour https://vimeo.com/1105993568?share=copy#t=0


CRMLS – RECore
Listed by Eric Tomlinson First Team Real Estate 951-970-6727
agent

Elizabeth Kammen

Agent | License ID: 01981773

+1(805) 279-0727

GET MORE INFORMATION

Name
Phone*
Message

Go tour this home

235 Hanoverian DR